Bathroom renovations
Built for how the room needs to work now, and how it will need to work in twenty years.
Artin Homes recently completed renovating 3 full bathrooms and one powder room for us. We requested the bathrooms to be updated and senior friendly.
Artin Homes · Home Renovations in Richmond, BC
Home Renovations · Richmond
Artin Homes
Hugh
6188 Number 3 Rd, Richmond, BC V6Y 0J3
10
Verified reviews
14 years
In business
Serving Richmond since 14 years
Richmond · Vancouver · Burnaby
Straight answers and a price before anything gets touched.
Built for how the room needs to work now, and how it will need to work in twenty years.
A strata board, a rental turnaround, or a house you just bought — scoped and sequenced before anything is demolished.
The room the whole house runs through, sequenced so it is unusable for the shortest stretch possible.
Ten Google reviews, ten five stars, and Hugh replies to nearly every one himself — nine of ten carry his own reply, signed.
Hugh, ARTIN HOMES 安庭建筑 — ten reviews, ten five stars
Three Bathrooms & a Powder Room · Richmond, week by week.
WEEK 01 · 13 JAN WHOLE UNIT · PLANNING
Blocking plan set before any wall opens — where grab bars go in each bathroom, where the curb comes out of the main shower, where the extra lighting layer runs. Written down before a single fixture is ordered.
WEEK 02 · 20 JAN POWDER ROOM · DEMOLITION
Powder room stripped to the studs first — smallest room, fastest to close back up, and the one bathroom nobody in the unit needs to keep using while the rest of the job runs.
WEEK 03 · 27 JAN POWDER ROOM · FINISH
Powder room tiled and fixtured, back in service. One room down; three still ahead.
WEEK 04 · 03 FEB ENSUITE · WATERPROOFING
Curb removed, floor dropped to hold the fall to the drain — the decision that makes a shower curbless instead of just low. Membrane goes in before a single tile.
WEEK 05 · 10 FEB ENSUITE · ROUGH-IN
Second lighting circuit run for the night layer — a dimmer, separate from the main switch, so the room can be lit for use without a full-brightness wake-up. Vanity-wall blocking confirmed for the pull-out drawers.
WEEK 06 · 17 FEB ENSUITE · TILE
Curbless pan tiled level with the floor outside it. Grab bar anchored into the blocking from week one, not toggle-bolted into drywall after the fact.
WEEK 07 · 24 FEB MAIN BATH · DEMOLITION
Main bath opened last, on the same blocking-and-lighting plan as the ensuite — repeat the decision, not re-invent it.
WEEK 08 · 03 MAR MAIN BATH · FIXTURES
Vanity set with pull-out drawers at counter height, night-vision lighting layer wired to its own switch, grab bars into blocking. Punch list walked room by room before anything is called finished.
Hugh, ARTIN HOMES 安庭建筑
Hugh runs Artin Homes on one rule the reviews keep naming without being asked: decide it before the wall comes down. Three full bathrooms and a powder room were planned senior-friendly — the curb removed, the floor dropped to hold the drain fall, a second lighting circuit for night vision, vanities with pull-out drawers set at a reachable height — before a single fixture was demolished, not chosen afterward from what was left.
That same planning-first approach carries a project through a strata board. A comprehensive condo renovation in Coal Harbour ran under a strata office holding strict compliance standards and still closed out in three months, on the quality, budget, timeline and delivery the client asked for at the start.
Hugh replies to nearly every review himself — nine of the ten on the Google listing carry his own words, not a template response. A rental-unit turnaround was praised, unprompted, by the building manager himself: the best renovation in the building in the last ten years.
The team is his — coordinated, sequenced, and scheduled so the trades are not waiting on each other and a household is not left guessing which room is next.
Hugh
Owner, ARTIN HOMES 安庭建筑
Fourteen years in Richmond renovation, and the habit that shows up across ten reviews without being asked: plan the decisions before the demolition starts. Hugh replies to nearly every review personally, and the reply usually says what got planned, not just what got finished.
Replies to nearly every review himself — nine of ten, signed.
Every job starts the same way, whatever room it is.
The number moves with what the walkthrough finds — not after work starts.
Board approval is a real step, not paperwork to route around.
The building manager came to visit and was so impressed after the completion. He said this is the best renovation in our building for last 10 years.
Faye Han · Google review, ARTIN HOMES 安庭建筑, captured 2026-08-18
Last year I worked with artin for a full home renovation after purchasing our house, and I couldn't be happier with the results! From start to finish, the entire process was incredibly smooth and efficient. The work was completed on time, …
HANDOVER · 10 MAR 3 Baths + Powder Room · SIGNED OFF
Walked room by room before anything was called finished — the ones this household will use for the next twenty years, not just this one.
Based in Richmond. These are the places Hugh actually drives to.
Based in
Richmond
10 Google reviews
Curbless shower - senior friendly
I am very grateful to Artin Homes for doing all the renovations for my rental unit. The building manager came to visit and was so impressed after the completion. He said this is the best renovation in our building for last 10 years. He can …
The things homeowners usually want to know before they let anyone in the door.
Yes. A curbless shower, a fold-down seat and grab bars set into real blocking read as ordinary fittings when they're chosen and positioned properly. The wood behind the wall has to go in early — retrofitting a grab bar into finished tile is a much worse day than putting the blocking in first.
Yes — a comprehensive condo renovation in Coal Harbour ran under a strata office holding strict compliance standards and closed out in three months, approval included. The compliance package gets prepared in the form the board's own bylaws ask for.
Yes. A rental-unit renovation was praised, unprompted, by the building manager himself, who called it the best renovation in the building in the last ten years.
The scope, the blocking plan for any grab bar or heavier fixture, and the lighting circuits — decided and written down before a wall opens. Attention to that planning stage is the thing customers write about most.
Workmanship is covered for one year from handover — if something we built moves, cracks or fails, we come back and fix it. Fixtures, appliances and finishes carry whatever term their own manufacturer publishes.
It starts at the same walkthrough that sets the blocking and lighting plan — every fixture, wall and finish decided and written down first, and the quote is priced against that agreed scope. If a strata board is involved, the compliance package is priced in from the start, not added later. The number moves only if the scope does, and that's a conversation before it happens, not a line on the invoice after.
Ask for the business licence in the city the work is in, a certificate of liability insurance, and a WorkSafeBC clearance letter — you can confirm coverage with WorkSafeBC directly. British Columbia does not licence general renovation contractors the way it licenses new-home builders, so these three are the checks that actually exist.
Excellent renovation experience - highly recommend! I recently hired them for a renovation project and couldn't be happier with the results. From start to finish, they demonstrated exceptional professionalism and …
Very happy with the renovation work. The team was professional, hardworking, and completed everything nicely. Great quality and attention to detail. Highly recommend!
We recently hired ARTIN HOMES to complete the renovation of our home. They gave us a lot of useful professional advice during the renovation project. The whole team is very professional and empathetic, especially in the project arrangement …
ARTIN HOMES successfully helped my family had a comprehensive condo renovation in Coal Harbor two years ago. We were very specific on quality, budget, timeline and delivery. And our strata office holds high standards on compliance and …
The expertise service is beyond average industry level, the attention to details and their due diligence has made me rest assure that I can leave all my renovation needs in good hands! Hugh is very helpful!
Professional, reliable, and skilled. The renovation was exactly what I envisioned, and the crew worked hard to bring it to life. I highly recommend their services!
Wonderful service, gave us professional advice. Couldn't be more sacrificed with the result.
Hugh will call you back on the number you left.